Celebration in Aba as Geometric Power turns on Turbine 3 ahead Tinubu’s commissioning Monday
As President Bola Tinubu prepares to commission the 181-megawatt Geometric Power plant in Aba, Abia State on Monday, Turbine 3 was turned on at 3.39 am on Sunday, leading to massive rejoicing by engineers and other stakeholders. They were joined by the Abia State Commissioner for Power and Public Utilities, Engr. Ikechukwu Monday. The President is expected to commission the …