Home News Lagos announces 4-month closure of Marine Bridge for repairs

Lagos announces 4-month closure of Marine Bridge for repairs

2 min read
0
0
115

Lagos State Government, yesterday, disclosed that it intends to shut the Ijora 7up end of the Marine Bridge from 2 February to 10 May 2024, for comprehensive maintenance.

Commissioner for Transportation, Mr Oluwaseun Osiyemi, who made the announcement, said some alternative routes have been mapped out for motorists during the repairs.

Osiyemi said: “Motorists heading towards Apapa from Marine Bridge are to ply: Malu Road via Mobil Road U-turn to link Marine Bridge Access Ramp (Inbound Apapa) and proceed to Point Road U-turn leading into Marine Bridge (Ijora bound) and follow the Diversion at closed section.

“Through this movement, they will be able to join the counter flow lane on the Apapa bound lane back to the Ijora bound lane after the closed section”.

Osiyemi assured that the traffic management personnel would be deployed to the affected routes to minimize inconveniences and improve traffic flow.

He said: “Marine Bridge Road inwards Malu Road to make use of the Mobil Road U-turn and proceed to Area B/NAGAFF to access Point road U-turn into Marine Bridge (Ijora bound)”.

Load More Related Articles
Load More By Breezynews
Load More In News

Leave a Reply

Your email address will not be published. Required fields are marked *

Check Also

CCTV cameras will be installed on Lagos-Calabar coastal highway – Umahi

The federal government has disclosed plans to install Closed Circuit Television cameras (C…